Skip to content
Our 3-stage process

Design. Permit. Build.

Three stages, each with its own scope, clearly outlined cost and precisely articulated deliverables. Once a stage is complete, you own the deliverables and decide whether to proceed.

The three stages

What happens, when, and what you hold at the end of each stage.

Questions about a stage? 604.765.1708
Great Room, North Vancouver 01Design · 6 – 10 weeks
01 Design 6 – 10 weeks

Bring all your ideas to Sasen Homes.

We love hearing from you and your vision. Gather your vision boards, Pinterest saves, colour ideas, magazine cuttings, everything. You then work with our designers, with more than 50 combined years of designing, building and renovating experience, to put your dream on paper.

The goal is to work through all the ideas, the ones you love, the ones you thought you loved and the ones you hadn’t considered, to arrive at the design that works best for you. Then we drill into the costing so it fits the budget.

Who you meetMatthew and our designers
How it is pricedFixed design fee, credited if you continue
You receive 01Measured survey and existing drawings 02Concept design options 03Costed scope with a budget range
At the end of this stageYou decide whether to go to permit, with the drawings in hand either way.
Heritage renovation, Queen’s Park 02Permit · 8 – 16 weeks
02 Permit 8 – 16 weeks

Your professionals, acting as your agents.

Architectural and engineering specifications, municipal documentation and permit requirements can be overwhelming, and they change per municipality. We have kept up with the bylaws for every type of permit and every neighbourhood we work in.

We handle every detail with the city, engage the submission process professionally and vigorously, and get the permits required as quickly as possible.

Who you meetSarita, our engineers and the municipality
How it is pricedFixed permit-package fee plus municipal fees
You receive 01Permit drawings and engineering 02Energy and seismic proposals where required 03The approved building permit
At the end of this stageYou decide whether to build, holding an approved permit that any builder can use.
Burnaby 03Build · 4 – 14 months
03 Build 4 – 14 months

Red Seal craft, weekly updates, one point of contact.

Our skilled Red Seal journeymen, project managers and ITA indentured apprentices come together with longstanding trade partners to execute a superior level of craft on every project. Rigorous quality control, daily communication and formal weekly progress updates, accountable timelines, and professional, clear invoicing.

From the date of commencement to the day you move in, the experience is set up and managed for success.

Who you meetPeter on site, Matthew throughout
How it is pricedFixed price from the permit drawings, with a recommended 15–20% contingency
You receive 01Weekly progress report every Friday 02Clear, itemised invoicing 03Your finished home and a two-year warranty
At the end of this stageYou move back in. Our commitment remains: Our Heart Your Home.

What you get at each stage

StageDeliverablesHow it is pricedDuration · decision
01Design Survey, concept options, costed scope, budget range Fixed design fee 6 – 10 weeks · proceed to permit?
02Permit Permit drawings, engineering, submissions, approved permit Fixed package fee + municipal fees 8 – 16 weeks · proceed to build?
03Build The renovation, weekly reports, itemised invoices, warranty Fixed price from approved drawings 4 – 14 months · move in

If you stop after any stage, the drawings and documents are yours to keep.

Budget planner

What does your project cost?

Pick a project type and move the slider. The band shows the range most Sasen projects land in.

Ranges reflect recent Sasen projects and the 2026 cost guide. Every home is different; a site visit gives you a real number.

01 · Project type
02 · Your budget
$0
Typical Sasen range
Typical Sasen range

What's included at this level
Discuss my budget CAD, 2026. Design and permit fees included; taxes excluded.
30+years renovating
50+combined design years
Red Sealjourneymen on every site
3 stagesone team
Start your renovation

Got a question? Ask Matthew.

A short note is enough to start. Matthew or Sarita will call or email within one business day.

5.0 Google · 15 reviews
HAVAN Renovator of the Year 2020
5.0 Google · 15 reviews
HAVAN Renovator of the Year 2020

“We completed two projects using Sasen Homes for all aspects of the job. One was a restoration of the exterior of our 1899 heritage…”

Bob · New Westminster heritage home · Addition & Second Storey

“After speaking with several homes and renovation companies and seeing homes they had renovated in our area, we decided on Sasen Homes to do…”

I & C · North Shore · Whole Home
What happens next
  1. 01We read your note and look at your area.Today
  2. 02A quick call to understand your home and goals.1 business day
  3. 03If it’s a fit, a site visit and Stage 1, Design.1–2 weeks
Prefer to talk now? 604.765.1708
Recognised by
Start Your Renovation

Tell us about your home.
We'll tell you what's possible.

A short note is enough to start. Matthew or Sarita will call or email within one business day.

Call Start Your Renovation